Electricity load shedding situation brought under control says Minister for Water and Power

The Pakistani minister for water and power Naveed Qamar told the media last night that they have to some extent controlled the load shedding situation and the production is brought to 12400 Megawatts (MW) from the 9000 MW which was being produced before. By the way, does someone did not told minister that the production was down to just 7500 MW, same thing had caused the worst short fall of history. Minister Naveed Qamar also claimed that the production will be back to 14000 MW within next 48 hours. I personally doubt that, as about same is the requirement of country’s power requirement, considering the load shedding which had been there from long time without any pauses, you can tell […]